Malaysia Training Center
Malaysia Training Center
Malaysia Training Center
Malaysia Training Center
Like this courseLike (8)PrintPrintPDFDownload PDFE-mailSend to a friend
BOOKING INQUIRY

Civil & Construction Engineering


Planning Construction Equipment And Methods For Reducing Cost Of High-rise Buildings


  REF: CE85  DATES: 12 - 16 Feb 2018  (One Week)  VENUE: Malaysia (Kuala Lumpur)-Grand Millenium Hotel

Overview:

A majority of high-rise commercial, industrial and institutional building construction projects experience cost over-runs. Proper planning, involving construction method selection, sequencing operations and coordinating  specialty trades, as well as selection and management of proper construction equipment for specific construction tasks and monitoring its production can help effect cost savings.
This course focuses on planning, implementing a schedule and avoiding mistakes in all construction operations, equipment, and methods needed for construction of high-rise buildings to help developers and their construction personnel complete projects within their budgeted cost.

objective:

To enable constructors of high-rise commercial, industrial and institutional buildings select construction methods and equipment and adopt systematic planning techniques to enhance savings.

Who Should attend:

Engineers, project managers, surveyors, field engineers, estimators, construction superintendents, technicians and technologists, general contractors, subcontractors, testing company personnel, building inspectors, and those who are new to construction business as well as those who want to sharpen their skills?

Out Lines:

Planning the Work at Bidding Stage

  • Site planning and management 
  • Temporary utilities requirement

Selecting And Sequencing Building Construction Methods and Equipment 

  • Selection and management of proper construction equipment for specific  
      construction tasks and estimating production/duration 
  • Establishing construction schedule

Construction Safety

  • Construction safety gear
  • Fall protection 
  • Construction safety signs
  • Safety training
  • Temporary heating

    Material Handling 
  • Cranes
  • Man material hoists
  • Loading platforms
  • Just-in-time delivery schedule

Concrete And Concrete Equipment 

  • Cranes 
  • Buckets, chutes, concrete pumps and water pumps
  • Air compressors
  • Forming Systems 
  • Scaffolding systems
  • Shoring systems
  • Formwork

Layout Engineering And Surveying

  • Drawings
  • Tolerances
  • Cambers
  • Concrete creep

Planning And Coordinating

  • Monitoring and updating the schedule
  • Job meetings
  • Corrective action and schedule update
  • Team work

Permanent Utilities

  • Power
  • Water
  • Storm and sanitary sewers

Final Completion

  • Defect list
  • Corrections
  • Paperwork 
  • Taking over and handing over
  • Meeting occupancy requirements

Claims

  • Relationship among architect/engineer, owner, contractor and subcontractors
  • Expediting/accelerating
  • Impact of delays
  • Additional work
  • Change orders
  • As-built schedule
COURSE DATES
12 - 16 Feb 2018
COURSE Duration
One Weeks
COURSE REF
CE85
VENUE
Malaysia (Kuala Lumpur)
Address
Grand Millenium Hotel